Service

Training

Applications

Parts

Tech Bulletin

Download Libary

  - Fadal
    Manuals

  - Hyundai-Kia
    Manuals




CNC Service

[ Training : Day/Night Classes ]   [ Applications ]   [ Parts ]   [ Downloads ]


Service Team Standby for Dispatch

 








Our customers repeat sales ratio is over 70%. Other than machine speaks for itself, the credit goes to Compumachine's acclaimed Service Department. Our average service engineer has over 14 years experience on a variety of CNC machine tools.

Our Service Engineers Have Average 14 years CNC Support Experience
 
Warranty Support, CNC PM & Repair, Machine Calibration, Retrofits & Upgrades..
Expert diagnosis, accompanied by readily available parts, and the latest web based communications make Compumachine the example to follow.

Our service engineers are strategically located through out New England to insure speedy response. Our latest on-line manual library and parts store are ready 24/7 to help your internal maintenance efforts.

Many machines sold back at 80's are still supported by the service department, the fact that so many of them are still performing their duties demonstrates the quality of our machines and the commitment of our service department. Our renowned P.M. program is available to extend the life of your CNC machine tools.

We know how costly downtime is, that's why every call is an emergency; We know how costly a service call can be, that's why we strive to solve the problem the first time.

Service Van Loaded With CNC Parts

 

 

 

 





PREVENTIVE MAINTENANCE
     - Check out our popular FADAL machine 33-point inspection PM Program


Machine Alignment:
1. Check and Adjust Machine Level.
2. Check all axis travel
3. Check and Adjust Backlash Settings
4. Remove Gibbs, Clean, Inspect and Readjust
5. Install new way wipers
6. Inspect and Adjust All Straps
7. Inspect Turcite on Table/Saddle
Way Oil System Maintenance:
8. Check pump for proper operation, pressure etc.
9. Clean Tank and Change Filter
10. Inspect all way oil lines
11. Change way oil manifolds or way oil injectors
Pneumatic System Maintenance:
12. Check air regulator for leaks or faulty seals
13. Check solenoids and air valves for leakage or malfunction
14. Drain and clear water trap on air line filter
15. Drain, clean and refill lubrication
16. Check main pressure ATC Maintenance
17. Remove covers and clean
18. Check and adjust alignments
19. Check slide and turret operation, and lubricate
Spindle System Maintenance:
20. Check spindle belts
21. Check spindle temperature and adjust chiller card
22. Check chiller system and adjust, and clean pump filter, fill if necessary
23. Check drawbar for proper retention and pressure at tool in/out (USE SVT0066)
24. Check and adjust spindle tram
25. Change Spindle Motor filter if applicable
Electrical System Maintenance:
26. Check all connections, wires, boards, connectors etc...
27. Check and adjust sin/cos on clock card (DC machines only)
28. Check ground integrity
29. Adjust position loop gain
Miscellaneous:
30. Check and clean all fans for proper operation
31. Check and fill all fluid levels
32. Check and adjust rigid tapping if applicable
33. Check scales if applicable


Contact us for PM quote & schedule




Fadal Parts
Online Super Store